Wood windows, Stucco, Insulation

I'm long overdue for an update. The white aluminum siding is almost entirely on, except for the area under the cantilever.





The first two coats of the labor-intensive, three coat stucco process is applied. The final coat must wait thirty days for the second coat to dry and set. What you see now is called the "brown" coat, but the color isn't that far from what we want.



Finally, the wood windows from Lindal are installed.



Unfortunately, the wood sliding doors have yet to arrive, which explains the bubbled and boarded-over areas on the west side of the house.



Lindal makes great windows, but they've consistently over-promised and under-delivered when it comes to scheduling; they've yet to actually deliver their product on the day that they promised. Oh well. The newest schedule is that we'll receive the sliding doors Monday.

Finally, insulation is installed. We ended up going with standard fiberglass batts, though I had my superintendent walk through the house with the sub-contractors and foam anywhere he saw daylight. So, hopefully we're a little more air-tight than usual.





Drywall has been delivered. We've passed framing and insulation inspections. Once the sliders are installed and drywall is finished, the fun of interior finishes begin! I'm also looking forward to the wood siding, which should warm up the exterior.

No comments:

Post a Comment