Progress has been fast and furious. On the exterior, nearly all the siding except for the final stucco coat and some panels between the windows are on. The underside of the cantilever soffit is now wrapped in white metal, which I think gives it a really luminous and lighter look than before.
All the cedar strip siding is on, as well. Between the black aluminum windows we'll be adding black-painted MDO panels, and between the wood windows we'll add panels of fir.
There has also been lots of progress on the inside, but pictures will have to wait since most of the finishes are covered up. A coat of primer has been sprayed on all the drywall, and the second floor stranded bamboo flooring and staircase is installed, but covered by protective cardboard. The third floor concrete floors are poured, and are looking great, but they're still covered by wet curing blankets as they continue to cure. Finally, the kitchen cabinets are being installed! So, lots of action, but pictures won't come until after the holidays. Happy holidays!
No comments:
Post a Comment